Dmitry Makhonin checked the reconstruction of the overpass on the street. Monastyrskayatranslated

Traffic along the reconstructed overpass is completely open along Monastyrskaya Street near the Meshkov House. The passage was also resumed on the section of the street. Maxim Gorky. This was announced by the Governor of the Perm Territory Dmitry Makhonin. As the head of the region reported, the bulk of the work has been completed. Now the final touches remain: adjusting the granite stone, setting up street lighting and architectural lighting. The overpass leads to the river and railway stations, the Art Gallery and the embankment. The work was carried out in difficult conditions: trains and electric trains constantly passed under the structure. The old structure was dismantled, and a new structure was erected in its place, preserving the historical appearance.
The left lanes on the Cosmonauts Highway will be temporarily closed. Wide sidewalks, an observation deck with a view of the Kama River and a direct descent to the embankment have been made for pedestrians. Photo: Perm administration.


